ISO 27001 and change management: Policies, procedures, and templates explained

Reviewed by: Zbignev Zalevskij (Chief Information Security Officer)

I remember sitting in a strategy review with a client’s CISO, watching frustration creep across their face. The problem wasn’t a lack of security controls—it was the avalanche of undocumented changes being pushed to production with no clear policy trail. The root cause? A gap in how change was managed under their ISO 27001 implementation.

Many organizations underestimate how central ISO 27001 change management is to operational resilience. Whether it’s patching servers, updating firewalls, or onboarding a new cloud vendor, changes can easily slip through the cracks without a clear process. What’s worse, audits quickly unravel when there’s no evidence of proper authorization, risk assessment, or traceability.

This article explores how ISO 27001 treats change management, what a strong ISO 27001 change management policy should include, and how to create practical, audit-ready documentation—with templates to ease the process.

Understanding the role of change management in ISO 27001

Before diving into templates and procedures, it’s important to answer a basic but frequently asked question: Does ISO 27001 cover change management? The short answer is yes—but not always as explicitly as people expect.

ISO 27001 requires organizations to maintain documented information for controls relevant to the Information Security Management System (ISMS). While change management isn’t a standalone control, it’s embedded in several key Annex A controls, such as:

These controls emphasize the need to manage changes that can impact information security. Whether it’s a configuration tweak or a significant system overhaul, each change must be evaluated for risk, approved by responsible parties, and documented appropriately.

For a deeper dive into how these controls are structured, the ISO/IEC 27002:2022 guidance expands on the implementation of these clauses with practical detail.

So how does that translate into policies and procedures?

Creating an ISO 27001 change management policy that works

A well-structured ISO 27001 change management policy is the cornerstone of compliance. It defines what constitutes a change, how changes are proposed, who approves them, and how records are maintained.

The biggest mistake I see? Policies that are either too vague or so complex they become shelfware. The goal is a clear, enforceable policy that integrates with daily operations.

Below is a breakdown of what an effective policy should include.

Key elements of an ISO 27001 change management policy

SectionDescription
PurposeDefines the goal of the policy: to manage changes that affect the confidentiality, integrity, or availability of information systems.
ScopeLists systems, departments, and types of changes covered (e.g., IT infrastructure, applications, outsourced services).
DefinitionsClarifies terms like “emergency change”, “standard change”, and “major change”.
Roles and responsibilitiesOutlines responsibilities for change requestors, approvers, implementers, and reviewers.
Change classificationCategorizes changes by impact and urgency, guiding the approval workflow.
Change processDescribes the lifecycle: submission, impact analysis, approval, testing, implementation, and post-change review.
Documentation and recordsSpecifies what must be documented for each change (e.g., risk assessment, approvals, rollback plans).
Monitoring and reviewRequires periodic review of change logs and audits of the process.

Once the policy is in place, procedures translate those rules into daily practice.

Building a robust ISO 27001 change management procedure

If the policy is the “what,” the ISO 27001 change management procedure is the “how.” It ensures consistency across teams and minimizes the security risks that often come with ad hoc changes.

But here’s the catch: procedures often fall apart because they ignore operational realities. A five-step approval chain for a minor UI fix? That’s a recipe for shadow IT. The best procedures scale based on risk and complexity.

Here’s how a practical change management procedure should flow.

TISO 27001 change management procedure lifecycle

PhaseDescription
1. Change initiationChange owner submits a change request form detailing purpose, scope, and timing.
2. Risk assessmentThe information security team evaluates the potential impact on security, business continuity, and compliance.
3. ApprovalDepending on change type, approvals may come from IT, security, business owners, or a formal Change Advisory Board (CAB).
4. Testing and validationFor non-emergency changes, testing in a non-production environment is required.
5. ImplementationApproved changes are implemented with rollback procedures in place.
6. Post-change reviewA review confirms whether the change met objectives, caused incidents, or needs documentation updates.

Each step should be time-stamped and logged in a system or tracked manually if systems aren’t available. Documentation is key—not just for internal control but also for passing audits.

Your ISO 27001 change management checklist

At this point, you may be asking: what exactly should I have in place for a successful ISO 27001 change management program? Here’s a comprehensive checklist to help you self-assess.

ISO 27001 change management compliance template

ItemIn Place?Notes
Change management policy is documented, approved, and reviewed annually
Change classification system (standard, normal, emergency) is defined
Formal risk assessment is conducted for each change
Role-based approval matrix is documented and enforced
All change requests are logged and time-stamped
Testing and rollback procedures are documented
Post-implementation reviews are conducted
Change records are retained for audit purposes
Policy and procedure are aligned with ISO 27001 Annex A controls

Completing this checklist isn’t just a compliance task—it’s a way to strengthen operational discipline and reduce security incidents caused by poor change control.

Building resilience one change at a time

Implementing a mature ISO 27001 change management procedure isn’t about ticking audit boxes—it’s about creating a culture where change is deliberate, traceable, and secure. Whether you’re managing a multi-cloud infrastructure or a single legacy system, every change introduces potential risk. But with the right structure, you can turn that risk into opportunity.

Start with a practical policy, embed realistic procedures, and use templates to accelerate adoption. Most importantly, treat change management as a living process—review it, test it, challenge it. Because in today’s fast-moving digital environment, your ability to manage change safely may be the best control you have.

If you’re reworking your change management approach or gearing up for your next ISO 27001 audit, which part feels like the biggest gap for you?

Automate Your Cybersecurity and Compliance

It's like an in-house cybersec & compliance team for a monthly subscription! No prior cybersecurity or compliance experience needed.

Related articles